Prufi
review-load-spectrumSupplied evidence required

Ordered stress-history damage estimate

Offline review with additional files and records

Scope and limits

Counts open-history three-point rainflow cycles and estimates linear Miner damage with an explicitly supplied amplitude/life curve.

This review is available through the separate offline tools. It does not run automatically when you upload a STEP file and requires the additional inputs described below.

Required inputs

Identified ordered scalar stress samples/times, subject/model, explicit fatigue curve/model and supplied damage limit.

Assessment limits

Finite scalar model and its declared domain only; no qualified spring material curve, physical lifetime or standards-conformity inference.