review-ecm-setupSupplied evidence required
Declared ECM setup envelope
Offline review with additional files and records
Scope and limits
Reviews actual cathode/workpiece/setup/electrolyte-region geometry and supplied qualified positioning limits.
This review is available through the separate offline tools. It does not run automatically when you upload a STEP file and requires the additional inputs described below.
Required inputs
Complete assembled CAD inventory, explicit positioning, material/process declarations and applicable qualified setup profile.
Assessment limits
Bounded nominal setup-envelope advisory; local-gap, electrochemical removal, electrolyte flow and process qualification remain unassessed.